🏥🇦🇺AS/NZS 2107:2016 · Australia/NZ

Hospital Ward Acoustic Design in AustraliaAS/NZS 2107:2016 Requirements

Patient wards, recovery rooms, consultation rooms. Typical volume: 100-500 m³.

RT60 Target
≤ 0.8s
Background Noise
≤ 40 dBA
STI Requirement
N/A
Regulation
AS/NZS 2107:2016 + AusHFG
RT60 (Reverberation Time)
The time, in seconds, for sound to decay by 60 dB after the source stops. AS/NZS 2107:2016 requires ≤ 0.8s for hospital ward spaces in Australia.
Reference: AS/NZS 2107:2016 + AusHFG

What AS/NZS 2107:2016 Requires for a Hospital Ward in Australia

Regulation: AS/NZS 2107:2016 + AusHFG

RT60 target: ≤ 0.8s

Background noise limit: ≤ 40 dBA

Local note: AusHFG Part D requires acoustic assessment for all new hospitals.

How to Calculate AS/NZS 2107:2016 Compliance for a Hospital Ward in Australia

  1. 1

    Identify the applicable Australia standard and target

    Look up AS/NZS 2107:2016 for hospital ward spaces in Australia. The RT60 target is ≤ 0.8s. AS/NZS 2107:2016 + AusHFG.

  2. 2

    Measure or model the room geometry

    Record the length, width, and height of the room to calculate the volume. A typical hospital ward has a volume of 100-500 m³.

  3. 3

    List all surfaces and their absorption coefficients

    For each surface (floor, ceiling, walls, windows, doors), find the absorption coefficient at each octave band frequency (125 Hz to 4 kHz) from ISO 354 test data or a materials database.

  4. 4

    Calculate total absorption and apply the Sabine or Eyring equation

    Sum all surface absorption values: A = sum of (alpha x area). Then apply T60 = 0.161 x V / A (Sabine) or T60 = -0.161 x V / (S x ln(1 - alpha_avg)) (Eyring). Use Eyring when average alpha exceeds 0.20.

  5. 5

    Compare result against AS/NZS 2107:2016 and specify treatment

    If the calculated RT60 exceeds the target of ≤ 0.8s, specify additional absorption. Typical treatment cost in Australia is AUD 28,000–AUD 45,000 per 100m².

Cost of Compliance in Australia

Treatment Cost Range

AUD 28,000–AUD 45,000 per 100m²

Currency: AUD

What Affects Cost

  • • Room volume and surface area
  • • Target standard strictness
  • • Existing acoustic conditions
  • • Finish and material quality

Frequently Asked Questions

What RT60 does AS/NZS 2107:2016 require for a hospital ward in Australia?

AS/NZS 2107:2016 requires a reverberation time of ≤ 0.8s for hospital ward spaces in Australia. AS/NZS 2107:2016 + AusHFG. Measurement should be performed per ISO 3382-2 methodology.

What is the background noise limit for a hospital ward in Australia?

The background noise limit is ≤ 40 dBA under AS/NZS 2107:2016. This typically refers to HVAC and building services noise measured with the room unoccupied.

How much does acoustic treatment cost for a hospital ward in Australia?

Typical acoustic treatment for a hospital ward in Australia costs AUD 28,000–AUD 45,000 per 100m². Costs vary based on finish quality, room size, and existing conditions.

Calculate AS/NZS 2107:2016 Compliance for Your Hospital Ward in Australia

Enter your room dimensions, select materials, and instantly verify compliance against AS/NZS 2107:2016. Free, no signup required.

Open Free RT60 Calculator