Skip to main content

Articles tagged “WELL v2

11 articles covering WELL v2 in acoustic engineering and building design.

📋
STANDARDS11 min readFeatured

WELL v2 Feature S01 (Sound): The Calculation Method Explained

How to calculate WELL v2 Sound Feature S01 compliance — RT60 targets, background noise, STC requirements, and the performance verification path.

March 20, 2026
WELL v2WELL certification
🎓
TUTORIALS13 min read

WELL v2 Feature 74 Compliance: Full Acoustic Calculation for a 3-Storey Office

Full WELL v2 Feature 74 compliance check for a 3-storey office: Sound Mapping (L01), STC requirements (L03), Background Noise (L05), and RT60 (L07) with detailed calculations.

March 18, 2026
WELL v2Feature 74
📐
GUIDES11 min read

Free WELL v2 Feature 74 Compliance Checklist — All 7 Parts Covered (PDF)

Step-by-step WELL v2 Feature 74 compliance checklist covering all 7 parts (L01–L07): thresholds, measurement methods, documentation requirements, and common failure points.

March 18, 2026
WELL v2Feature 74
📐
GUIDES14 min read

WELL v2 Acoustic Requirements — 3 Features Most Projects Fail | Free Checklist | AcousPlan

WELL v2 Feature 74 has 7 acoustic requirements. Most projects fail L03, L05, and L07. Free compliance checklist with threshold values for each part.

March 18, 2026
WELL v2Feature 74
⚖️
COMPARISONS11 min read

Office Background Noise Limits: BS 8233 vs WELL v2 vs ASHRAE vs AS 2107 vs DIN 4109

Office background noise criteria compared across five international standards: BS 8233, WELL v2 Feature 74, ASHRAE 189.1, AS 2107, and DIN 4109. Real limits, measurement methods, and compliance explained.

March 18, 2026
office acousticsbackground noise
📐
GUIDES21 min read

The 8-Step Acoustic Design Process: From Brief to Handover

A complete guide to the acoustic design workflow: from understanding the brief through target selection, RT60 prediction, material specification, construction supervision, and post-completion testing per ISO 3382. Learn what happens at each stage, who is responsible, and what can go wrong.

March 14, 2026
acoustic designworkflow
🏛️
PILLAR15 min read

State of Office Acoustics 2026 — Data from 500 WELL Assessments

A comprehensive analysis of acoustic performance data from 500 WELL v2 assessments worldwide. Covers RT60 distributions, common failure modes in Feature 74, regional differences between UK, US, and Australia, and the trends reshaping office acoustics in 2026.

March 14, 2026
office acoustics dataWELL assessment data
📐
GUIDES18 min read

How Much Does WELL Certification Cost? Breaking Down the Acoustic Component

Complete cost breakdown of WELL Building Standard v2 certification with detailed analysis of the acoustic component: Sound Mapping, Sound Masking, Sound Barriers, Sound Absorption, and Sound Reinforcement. Typical acoustic costs represent 15-30% of total WELL budget — here is how to optimize spend.

March 14, 2026
WELL v2certification cost
⚖️
COMPARISONS21 min read

Open Plan vs Enclosed Offices: The Acoustic Trade-offs That Determine Workplace Satisfaction

Open plan offices cost 40-60% less per desk but generate 3x more acoustic complaints. Enclosed offices provide speech privacy but reduce collaboration. Here is the acoustic comparison with STI measurements, distraction distance data, WELL compliance pathways, and the hybrid compromise that works.

March 14, 2026
open plan officeenclosed office
📋
STANDARDS21 min readFeatured

WELL v2 Feature 74 (Sound) Complete Guide: Every Requirement, Threshold, and Compliance Path

WELL v2 Feature 74 has three parts: Sound Mapping (RT60), Sound Barriers (background noise), and Sound Masking (speech privacy/STI). Here is every threshold, every space type, every measurement condition, and the compliance pathway for each part — from precondition to optimization.

March 14, 2026
WELL v2Feature 74
🏛️
PILLAR26 min readFeatured

Open Plan Office Acoustic Design: The Complete Guide (WELL v2 | BS 8233 | ISO 3382)

The definitive guide to open plan office acoustics covering WELL v2 Sound features, BS 8233 targets, ISO 3382-3 open plan parameters, sound masking, and the ABC rule. Includes worked examples, compliance checklists, and cost analysis for 200-2000m² floor plates.

March 13, 2026
open plan officeWELL v2